Beyond The Valley Festival:

MAIN Stage

  • Installation of Full Set / Decor Design on Main Stage 
  • CNC Cut all Mirror Gold Acrylic 
  • CNC Cut all White Acrylic Washers for fixings
  • Pixel Led Neon Illumination on Edges
  • Controlled Via MA2 / HOG 4 with Touring Lighting Designers

Tent Stage:

  • Installation of 96 x 1.2m LSS Pixel Bars ( 72 Segments Available ) 

3rd Stage:

  • Installation of all Pixel control Elements
  • MADRIX Software
  • Pixel Wall
%d bloggers like this: