Beyond The Valley Festival:
MAIN Stage
- Installation of Full Set / Decor Design on Main Stage
- CNC Cut all Mirror Gold Acrylic
- CNC Cut all White Acrylic Washers for fixings
- Pixel Led Neon Illumination on Edges
- Controlled Via MA2 / HOG 4 with Touring Lighting Designers
Tent Stage:
- Installation of 96 x 1.2m LSS Pixel Bars ( 72 Segments Available )
3rd Stage:
- Installation of all Pixel control Elements
- MADRIX Software
- Pixel Wall